Crossville, Tennessee Healthcare

Cumberland Medical Center

Hospital Additions and Renovations

This project was a two-phased project consisting of a 134,000 square-foot 5-story addition and a 42,000 square-foot renovation. The work in the existing Powerhouse included installing a new steam boiler and chiller. This installation required tie-ins to the existing equipment to maintain service to the existing facility while utilizing these services for temporary climate control for the new addition. This work, along with the medical gas systems change-outs and tie-ins, required close coordination with the facility.

Ivey Mechanical’s fabrication shop was used to cut, weld, and groove cast iron for two floors of patient rooms. We worked more than 107,000 man hours on this project without a lost-time accident.

Capabilities

Next Project > Cedar Park Regional Medical Center

Contact

MAKE A SERVICE CALL